Wall fence installation steps
1. Preparation: Please prepare a work table
2. Install a Creep: Place the bar lawn guard supplier by length and place the PTE Creep at the side of the bar through-hole.
3. Install a fixed vertical rod: the same size fence fence bar rails placed on the work of the table, a unified side of the waterproof pad. Insert a fixed vertical rod (with screw hole) into the crossbar from the opposite side of the waterproof gasket.
4. Tighten the screws: Use a large flat-blade screwdriver clockwise to tighten the garden fence supplier's screws to make the fixed vertical bar and horizontal bar form a guardrail frame.
5. Install the vertical rod: the bottom of the through-hole for the vertical rod along the same direction into the bar.
6. Install the upper and lower card: a large card for the host card, a small card for the next card. First installed on the card. Insert the side of the clip U-shaped opening into the vertical bar.
7. Use a special clamp to push the clamp to reach the slot position, automatically bounce. Then install the lower card according to law. When the installation error can also use a flat-blade screwdriver into the vertical bar to flush the clip.
8. Assembly completed: Press UNG completed, check each rod is fixed in place to complete the assembly work.