How to install the chain link to save time and effort ?

Jun 28, 2018

What is the installation of the chain link fence?

 How to install the chain link to save time and effort ?

The installation steps of the chain link are as follows:

1. Prepare a fence rail to install a professional work desk

2. Install the anti-cutting accessories: the bar according to the different length, attribute classification placed in the cross-hole on the side of the PTE installed anti-cutting accessories.

3. Install the fixed vertical bar: the same size bar on the work table on the fixed card position, there is a waterproof side of the uniform direction. Place the fixed vertical bar (with screw hole) from the opposite side of the waterproof pad into the crossbar, according to the design drawing style as a reference.

4. Tighten the screw accessories: Straighten the screws with a flat-blade screwdriver to make the fixed vertical bar and the crossbar form the overall frame of the wall rail.

5. Install the common vertical bar: the vertical bar with two through holes at the bottom is inserted into the crossbar in the same direction.

6. Install the upper and lower card: the big card for the upper card, small chuck for the next card. First installed on the card. Insert the U-shaped opening of the clip into the vertical bar.

7. Use a special card to push the card to reach the card slot position, automatic bounce. And then according to the law to install the next card. When the installation is wrong can also be a word screwdriver into the vertical bar will be washed out of the clip. 8. Chain Link Finger Assembly completed: After the completion of the bar by UNG, check each vertical bar is fixed in place to complete the assembly work.

 How to install the chain link to save time and effort ?

Chain link fence is very common in our lives, such as the fence of the stadium, the purse of the district and so on. In order to ensure that the chain link fence can be fixed on the ground to ensure that its vertical degree to meet the requirements, it is necessary to install the poke in the chain link fence, fixed its guide frame, so installed out of the chain link will meet the requirements.

The linker of the chain link is the guide beam and the core pile. The distance between them is 3 meters. The spacing of the guide beam is about 1 centimeter higher than that of the wall. When the guide beam is installed, its position should be far from the chain of fence, and the surrounding pile should not be enlarged. This will cause the pile to sink or change the shape. In the installation, be sure to use the theodolite and the level of the tester, in order to make the installation becomes more accurate, but also reduce the installation of the error, you can also determine the beam in a short time the location and height.

Only in determining the height of the guide beam, to determine the forklace net in the pile when the height, so that installation becomes more convenient, but also save time and effort.

Pre:Double Horizontal Wire Welded Fence - 868/656/545

Next:The usefulness of picket fence

Recent Posts

Follow Us

Fast Delivery Promise

Fast Delivery Promise

Join our mailing list for product update and news.


© 2024 Linkland Fence. All Rights Reserved.
hide