Linkland Fence Linkland Fence
Home / NEWS /

Tennis court installation sequence and requirements

Feb 14, 2020
Tennis court installation sequence and requirements
When installing uprights, do not use iron tongs to open the connection slot, otherwise the surface protective layer of the fence will be damaged.
Tennis court installation sequence and requirements
During the construction and maintenance of the cement chip layer, all the embedded parts must be installed. When the ground floor of the first layer of the construction foundation is leveled, all the embedded parts must be embedded and embedded in accordance with the design requirements of the drawing. The wire tube is PVC rubber tube, and the net net column is embedded with special embedded parts.
The fence installation includes poles, upper and lower crossbars and fences. All poles, crossbars, fences and doors are coated with alkyd red rust-proof primer for more than two layers, and then coated with alkyd outdoor magnetic paint for two colors It is green, and the fence installation includes flat iron and all fittings.

Pre:New fence nets and balcony fence nets

Next:Dense grain fence 358

Recent Posts

Follow Us

Fast Delivery Promise

Fast Delivery Promise

Join our mailing list for product update and news.


© 2024 Linkland Fence. All Rights Reserved.
hide