Home /
NEWS /
Ground treatment of chain link fence fence stadium before installation
Feb 14, 2020
The necessary condition before outdoor installation is that the ground needs to be well prepared, and as a professional, it is the obligation to inform customers how to handle the stadium fence.
1. Clean up and repair the foundation site:
Repair some potholes and depressions, and then clean or wash the entire site. It should be noted that the repaired site must be dry (usually 24 hours) before continuing construction.
2. Laying adhesive layer:
A layer of adhesive needs to be applied to the base surface layer, which can be tightly adhered to the cement surface and tightly combined with the plastic material of the surface layer, and can prevent problems such as degumming and peeling. 3. Laying the foundation enhancement layer:
In order to enhance the strength, flatness and longevity of the site, the main raw materials of the plastic surface layer are acrylic acid, quartz sand, and water, which are mixed in a certain proportion to form an emulsion, and are evenly spread on the site.
4. Padding layer:
The acrylic color base material is added to the appropriate quartz sand for mixing and paving. The effect of incorporating the quartz sand is not only abrasion resistance, but also the speed of the ball can be adjusted according to the amount of use. 5. Surface oil laying:
It is mainly composed of acrylic surface oil mixed with a certain proportion of water and spread evenly on the filling layer. It is bright in color, resistant to UV fading, and has a certain degree of abrasion resistance.
Pre:Dense grain fence 358
Next:How large is the mesh of the stadium fence?